Rigorous 7-Stage Manufacturing & Quality Protocol

Discover Glead's zero-defect manufacturing process: from Spectrometric raw steel verification to 72-hour continuous electrical run-in burn testing.

The 7-Stage Zero-Defect Production Architecture

Every commercial kitchen unit produced in our Guangzhou facility passes through seven mandatory quality control gates before being authorized for wooden crate packaging and FCL container loading.

GateInspection NodeTest Criteria & ToolingTolerance Limit
Gate 1Raw Steel Metallurgical AssayOptical Emission Spectrometry (OES)Cr ≥ 18.0%, Ni ≥ 8.0% (SUS 304)
Gate 2CNC Punching & Laser CuttingTrumpf 6kW Fiber Laser Center±0.1 mm dimensional accuracy
Gate 3Thermal Insulation FoamingHigh-Pressure Cyclopentane Injection70mm wall thickness, 42 kg/m³ density
Gate 4Refrigeration Hermetic CircuitNitrogen Leak Test @ 28 bar0.00 ppm helium sniffer detection
Gate 5Electrical Safety Compliance1500V Dielectric Withstand TesterZero breakdown / leakage < 0.5mA
Gate 672-Hour Continuous Run-InFull-Load Temperature Pull-DownHACCP 90-min core pull-down verified
Gate 7Final Packaging & Crate ArmorNon-fumigation Plywood PalletizingISTA 3A transit drop test approved